MULTISTAGE BILEVEL PLANNING MODEL OF ENERGY STORAGE SYSTEM IN URBAN POWER GRID CONSIDERING NETWORK RECONFIGURATION

Multistage Bilevel Planning Model of Energy Storage System in Urban Power Grid Considering Network Reconfiguration

The large-scale integration of renewable energy sources (RESs) and the rapid Holiday Decorations development of loads cause frequent transmission congestion in the urban power grid (UPG).Transmission system operators usually perform the high-voltage distribution network (HVDN) reconfiguration to mitigate the transmission congestion.However, as the

read more

Isolation and structure of the fibril protein, a major component of the internal ribbon for Spiroplasma swimming

Spiroplasma, which are known pathogens and commensals of arthropods and plants, are helical-shaped bacteria that lack a peptidoglycan layer.Spiroplasma swim by alternating between left- and right-handed helicity.Of note, this system is not related to flagellar motility, which is widespread in bacteria.A helical ribbon running along the inner side o

read more



Well wall water leakage control technology of vertical well drilling method in coal mines based on grouting of ground directional drilling

The coal mine drilling shaft wall is a single-layer structure, and water leakage in the deep alluvium will seriously threaten mine safety.If there are construction defects in the stubble part of the well wall at the construction stage, Montana it will lead to groundwater corrosion and rust through the metal and the weld seam of the stubble part, re

read more